Technical capability

Machine modernisation and IoT integration development

We develop custom electronic and software projects that make our customers' existing machines and equipment traceable. We approach modernization in stages by understanding the current operation, accessible signals and production plan.

Representative architecture describing the addition of sensors, data collection, and server connectivity to an existing machine
Conceptual technical representation · Technical competence
BeginningCurrent system review
MethodPilot and phased implementation
FocusMonitoring and integration

Your project, your product

Developed confidentially and delivered with source files.

We may work with a confidentiality agreement (NDA) before sharing technical details. At the end of the project, we deliver the source codes, design files and technical documents we have developed to you.

  • NDA before sharing technical information
  • Clear deliverables agreed at the outset
  • Source and technical files at the end of the project
Our confidentiality and delivery process

VOMRO engineering approach

We add new functionality knowing the limitations of the existing machine.

It is not always necessary to renew the control system in order to automate a working machine. Reading appropriate signals and using an additional sensor or data acquisition board may be sufficient. Which approach will be applied is determined as a result of existing documents and technical review.

VOMRO clearly defines the scope of modernization as monitoring, communication and, if necessary, controlled change of functions. Changes that have an impact on the machine's safety functions and the production process are also evaluated.

01

Signal and interface inventory

Schematics, device list, existing protocols and field connections are examined. The level, meaning and reading method of the available signals are determined. Unavailable information is not left as an assumption; Necessary measurements and observations are planned. Usage rights and access rights of existing software and documents are also evaluated.

  • Existing system and data sources
  • Technical limits and access authorizations
02

Validate need with limited pilot

The first implementation can be planned on a selected machine or function. The data acquisition board, sensor and server connection are developed in this context. Records such as production count or operating status are compared with the actual process. Installation and commissioning steps are arranged together with the operating schedule and downtime possibilities of the enterprise.

  • Function verification on the selected machine
  • Integration in accordance with the production plan
03

Revision and adaptation to other machines

Interfaces, displays and alarm rules are corrected with pilot findings. When switching to other machines, the signal and operation differences of each equipment are reconsidered; It is not assumed that one solution will fit everywhere equally. Connection drawings, device configurations and version records are organized so that the maintenance team can use them.

  • Interface adaptation according to machine
  • Maintenance and release documentation

How it works

A clear process from start to delivery.

Not every project looks the same; however, the measurable requirement, controlled revision, and field verification steps remain unchanged.

  1. 01

    We examine the existing structure

    We uncover signals, protocols and production constraints together.

  2. 02

    We choose pilot scope

    Together we determine the measurable target and the initial implementation limit.

  3. 03

    We evaluate on site

    We compare the records with the actual operation and make the necessary revisions.

  4. 04

    We prepare for the next stage

    We deliver the source files, connection details and technical files together.

Frequently asked questions

Before starting the project

The technical scope, deliverables and test plan are clarified together according to the requirements of your project.

Can old machines also be connected to the system?

It can be evaluated if there is a suitable signal or additional sensor opportunity. Applicability is determined by the technical structure of the machine and field inspection.

Is intervention in the control system necessary?

No. Separate interfaces for monitoring can be considered. If a control change is required, safety and operational effects are examined separately.

Do you provide confidentiality and deliver the source files?

We can work with NDA. We deliver the source code, design and technical files of the project at the end of the project. We clarify the delivery list together at the beginning.

Let's start with your idea

Let's talk about the product you dream of and the need you want to solve.