Technical capability

Smart PDU and power distribution electronics development

We develop electronics and software combining in-cabinet power distribution, energy measurement and remote monitoring for customer projects. Electrical requirements, rack layout and the management interface are addressed in one design plan.

Representative diagram describing power distribution, measurement and communication electronics in the customer project
Conceptual technical representation · Technical competence
ScopeMeasurement + control + communication
IntegrationCabinet and management software
OutputProject-specific design files

Your project, your product

Developed confidentially and delivered with source files.

We may work with a confidentiality agreement (NDA) before sharing technical details. At the end of the project, we deliver the source codes, design files and technical documents we have developed to you.

  • NDA before sharing technical information
  • Clear deliverables agreed at the outset
  • Source and technical files at the end of the project
Our confidentiality and delivery process

VOMRO engineering approach

We define the power distribution along with the monitoring need of the project.

PDU development starts with more than socket count. Load types, supply arrangements, operating environment, measurement points and user information needs are defined. Monitoring total consumption and metering each outlet separately require different hardware and software.

VOMRO transfers these needs to the measurement board, control unit and mechanical layout. If data sharing is required with the existing management system, the protocol and access rights are defined at the beginning.

01

Measurement chain and event information

Current and voltage detection, measurement range, sampling and calibration approach are selected according to the target. Timestamp of measurement data, device ID and alarm status can be kept together. The accuracy of the sensor as well as the connection pattern, temperature effect and the software's interpretation of the data are also evaluated.

  • Measurement at supply and output level
  • Threshold, alarm and event recording
02

Embedded software and management interface

Where output control is required, startup sequencing, permission boundaries and behaviour during communication loss are defined. Monitoring can be developed through a local interface, Ethernet or other project-appropriate connections. Commands, responses and fault notifications between the dashboard and device share a data model.

  • Controlled command and response flow
  • Remote monitoring suitable for the project
03

Mechanical layout and verification

Connector access, cable directions, thermal dissipation and service areas are examined along with the mechanical design. In a design that includes mains voltage, isolation, protection and target usage conditions are also evaluated. Functional prototype does not mean that safety and compliance verifications of the final device have been completed; Necessary tests are included in the project plan.

  • Rack and cable placement
  • Function evaluation under load

How it works

A clear process from start to delivery.

Not every project looks the same; however, the measurable requirement, controlled revision, and field verification steps remain unchanged.

  1. 01

    We identify the requirements

    Together we determine the loads, measuring points and management requirements.

  2. 02

    We build architecture

    We match power, measurement, control and mechanical interfaces.

  3. 03

    We test the prototype

    We evaluate measurement, command, alarm and connection scenarios.

  4. 04

    We deliver the files

    We organise the source files and technical records for the approved revision.

Frequently asked questions

Before starting the project

The technical scope, deliverables and test plan are clarified together according to the requirements of your project.

Can you work with the existing cabinet design?

The scope of electronic and mechanical integration can be determined by examining cabinet dimensions, mounting points, supply and load information.

Is separate control of outputs mandatory?

No. Monitoring alone or monitoring together with control can be planned. Functions are selected according to the project's operational and safety requirements.

How is confidentiality and file delivery handled?

We can work with NDA. We deliver the source code, design and technical files of the project at the end of the project; We clarify the delivery list and file formats at the beginning.

Do you deliver source codes and technical files at the end of the project?

Yes. We deliver the source codes, design files and technical documents we developed within the scope of the project to you at the end of the project. The delivery list and file formats are clarified at the beginning.

Let's start with your idea

Let's talk about the product you dream of and the need you want to solve.